CASE STUDY – HILTON GARDEN INN

Hilton Garden Inn, Bozeman, MT

Hilton Garden Inn, Bozeman, MT

A recently constructed 122-room Hilton Garden Inn in a fast developing area of Bozeman, MT features a hydronic LoadMatch® system for heating and cooling instead of PTAC units with electric heat and cooling, as proposed to meet the project budget. Ironically, the local electric utility provided $70,000 to go forego electric use, based on a projection that greater energy savings could be achieved by going hydronic with LoadMatch and natural gas-fired boilers.